What a full or major home renovation costs in Cobourg, plus kitchens, bathrooms and basements.
Rough budgets before HST. The real number comes after a site visit and drawings. Older homes can hide wiring, plumbing or framing that needs fixing.
The per sq ft rates multiplied out, before HST. HST at 13% goes on top.
Treat these as a starting point for a budget, not a quote. Older houses often land higher once the walls are open.
A gut renovation replaces wiring, plumbing and insulation. A major interior renovation keeps more of what's there.
Older houses can have knob-and-tube wiring, galvanized pipes or framing that needs fixing.
Moving walls, stairs or the kitchen adds structure and trades.
The most expensive rooms per square foot.
Exterior work on a designated property needs a heritage permit and fitting materials.
Flooring, trim, cabinets and fixtures you pick.

Start with a site visit. We walk the house, look at what's there and talk through what you want.
Then come the drawings and a detailed price.
Book a site visit$185 to $300 per sq ft before HST as a rough budget for a full gut renovation.
$125 to $180 per sq ft before HST.
Kitchens run $25,000 to $120,000+ and bathrooms $10,000 to $30,000+, before HST.
No. The budgets on this page are before HST.
About 2 to 4 months for a bungalow and 3 to 6 months for a two-storey house, after permits.
A site visit shows what your house needs and what the Town will ask for.